Projects: Water
SA Water
SA Water active projects ranging from wastewater treatment plants, pump stations, dosing stations, in ground storages and tanks, PLC, SCADA, pipework upgrades and work surrounding desalination plants.
CAPEX: Various | DATES: 2018 – 2019 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS has an ongoing cost estimating role as part of SA Water Estimating team assisting SA Water estimators and engineers in developing costs for various types of projects at various stages.
VALUE ADDED
Capisce QS strives to build long lasting relationships with its clients. Through effective communication and reliable information, Capisce QS has built an ongoing relationship with SA Water, completing many cost estimates and asset valuations. This relationship has over time improved the knowledge, accuracy and importance of estimating within SA Water.
Happy Valley WTP Water Quality Improvements
The project looks at upgrading the Happy Valley water treatment plant to solve on going issues with aesthetics, taste and odour of the water. Works involve modification of existing flocculation chambers, construction of ozone generator, BAC filter upgrade and installation of tertiary UV system.
CAPEX: AUD 75M | DATES: 2018 | LOCATION: Happy Valley, SA
OUR INVOLVEMENT
Capisce QS provided a cost estimate on the design and construct of the water treatment plant, including preliminaries, civil works, mechanical works, electrical works, construction management, test and commissioning and design costs.
VALUE ADDED
Utilizing our extensive involvement in a vast range of Water projects through years of industry experience and knowledge, Capisce QS provided optioneering costs and assisted in a risk analysis for all options considered. Through creative thoughts and new ideas from all around the table it allowed us to make allowances for the unexpected and put contingency plans in place and provide independent cost
related recommendations.
SIMEC Northern Magnetite Water & Power
Due to the power-hungry nature of mining the SIMEC northern magnetite mine requires large amounts of power and water supplies to operate the mine. The remote location of the mine means there is a number of different proposed plans for the supply of water and power.
CAPEX: AUD 1B+ | DATES: 2018 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS provided GHD with cost estimates on power and water solutions for the anticipated processing plant at their mining operation in Northern South Australia.
VALUE ADDED
The provision of our high-level estimating service expanded across a number of options as the team sought to achieve the best value project solution. The outcome of this exercise reduced costs by millions across differing design solutions.
Give us a call to talk to our team to hear how we added value on all noted projects
Project Title | Date |
---|---|
Underground Assets | 2018 |
Happy Valley Sludge Business Case | 2018 |
Eyre Peninsula Desal Plant Update Options | 2018 |
Myalup Wellington Due Diligence | 2018 |
Uley South Borefield Expansion Options | 2018 |
Melrose & Quorn Water Quality Improvements | 2018 |
Port Lincoln Liverpool Street Pump Station | 2018 |
Happy Valley Water Treatment Plant Water Quality Improvements | 2018 |
Bolivar Dissolved Air Flotation Thickener & Primary Gravity Thickeners | 2018 |
Kangaroo Island Desalination | 2018 |
Adelaide Metro Drains Financial Review | 2018 |
Valuations - Waste Water Treatment Plants (WWTP) | 2019 |
Valuations - Pipes and Control Valves | 2018 |
Water Quality Improvements | 2018 |
Valuation of incomplete York Civil SA Water Works | 2018 |
Definition Phase Study (DPS) M6 Pipeline Replacement | 2018 |
Estimating assistance Nerabup Water Treatment Plant | 2018 |
Eastern Parklands Sewer Water and Power Provision | 2018 |
Bolivar Primary Gravity Thickener Works | 2018 |
Concentrate and Slag Leach Thickener Project | 2019 |
Park 20 Stormwater Options | 2019 |
Northern Water Supply | 2019 |
Valuations - Pipes 2020 | 2019 |
Valuations - Wastewater Pump Stations 2020 | 2019 |
Angle Vale Super School Water and Wastewater | 2019 |
Waste Water Treatment Plant to Hampden Road Sewer Trunk Main & new inlet | 2019 |
Essential Water Reverse Osmosis Plant Evaluation | 2019 |
Happy Valley Sludge Plant Options | 2019 |
SA Water General Works | 2019 |
Identified Underground Assets Rates Review | 2019 |
SA Water WET (Water Engineering Technologies) | 2020 |
Hampden Rd Transfer Mains - Options Study | 2020 |
WSRR-IPS (Wellfield Supply Replacement Reframing) | 2021 |
Barossa Infrastructure Ltd | 2021 |
Essential Water Sludge Lagoon | 2021 |
Upper South Creek Cost Management Services | 2021 |
SA Water Bores and Wells Asset Valuations 2021 | 2021 |
Water Tanks, Asset Valuations 2021 | 2021 |
SA Water Pipes, connections and Meters Asset Valuations 2021 | 2021 |
Menindee Water Treatment Plant, Sludge Lagoons 1&2 Expansion | 2021 |
Metro Water Treatment Plant Upgrade Options | 2021 |
Rymill Park Infrastructure Upgrade | 2021 |
Northern Water Supply Options Analysis and Business Case | 2022 |
Desalination Plant Cooling Tower Replacement IPS | 2022 |
Earth Storages, Asset Valuations | 2022 |
Reservoirs, Asset Valuations | 2022 |
Waste Water Treatment Plants, Asset Valuations | 2022 |
Water Dosing Stations, Asset Valuations | 2022 |
Waste Water Pump Stations, Valuations | 2022 |
V2 Food | 2022 |