Moonta Street: Adelaide City Council
Revamp of Moonta Street by the State Government and Adelaide City Council (ACC) including new granite pavers, more outdoor dining areas, new trees, creative lighting and more shade. A push to attract more tourists and boost local business supported this multi-million-dollar investment located in the heart of Chinatown.
CAPEX: AUD 4.2M | DATES: 2019 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS were engaged by ACC to carry out a preliminary estimate on paving upgrade works to Moonta Street, between Grote Street and Gouger Street.
VALUE ADDED
Capisce QS provided ACC with a preliminary estimate that included multiple scope options with risks and consequent contingencies required for each. Capisce QS identified potential savings for Adelaide City Council by providing pavement tile supply rates for local and overseas sourced products to help support ACC project budget.
Sturt Highway Estimates: DPTI
Upgrade and widening of Sturt Highway at Eudunda Road intersection and Dutton Mail road intersection to support increased traffic movements. The project involved road widening, safety bar installation, upgraded guard rails, line marking, tree removal and lighting upgrade.
CAPEX: AUD 1M | DATES: 2018 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS were engaged by the Department for Planning, Transport and Infrastructure (DPTI) to provide a detailed estimate in relation to the upgrade works proposed to the two intersections.
VALUE ADDED
The estimating undertaken informed the Department on the implications of differing sequencing and design solutions.
Victor Harbour Road / Goolwa Road Left Turn Deceleration Lane: DPTI
Widening of existing left turn deceleration lane with additional separation to correct driver behaviour and limit congestion.
CAPEX: AUD 0.4M | DATES: 2019 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS were engaged by the Department for Planning, Transport and Infrastructure (DPTI) to provide a concept estimate including optioneering in relation to the widening works.
VALUE ADDED
Capisce QS’s specialist industry experience and knowledge enabled early design phase estimating to support the department with the preparation of a robust project budget and the confidence to proceed with further design development.
Give us a call to talk to our team to hear how we added value on all noted projects
Project Title | Date |
---|---|
Estimating Assistance to Fulton Hogan | 2018 |
Union Street Upgrade works | 2018 |
Sturt Highway Estimates | 2018 |
Moonta Street | 2019 |
Synagogue and Austin Laneway Upgrade | 2019 |
Kangaroo Island Berthing Structures Upgrade | 2019 |
Victor Harbour Rd, Goolwa Rd, Left Turn Deceleration Lane | 2019 |
Far North Road Closure Signs | 2020 |
Separable portion C, Kempe Road | 2020 |
Lincoln Highway, New Tumby Bay Silo Access. | 2020 |
Jamestown Freight Route Bypass | 2020 |
Main North Rd /Park Terrace/Smith Rd Intersection Upgrade | 2020 |
Main North Rd /Clayson Road/Frost Rd Intersection Upgrade | 2020 |
McLaren Parade Port Adelaide | 2020 |
Strzelecki Track, Formation Works | 2020 |
Golden Grove Park & Ride | 2020 |
Extension of Left Turn Lane Elizabeth | 2020 |
Old Reynella Bus Interchange Amenity Upgrade | 2021 |
Trunk Mains MBDC Estimate Updates | 2021 |
Roundabout Upgrade - East Parkway Lightsview | 2022 |
Coffin Bay Jetty Refurbishment | 2022 |
Road Amendments - East Parkway Lightsview | 2022 |
BoM - AMBLS upgrade at Meekatharra | 2022 |
Victor Harbour Rd Safety Barrier Enabling Works | 2022 |
Old Reynella Bus Interchange Amenity Upgrade Level 5 Estimate | 2022 |
Buronga Landfill Expansion | 2022 |
Oodnadatta Track Formation and Re-Sheeting | 2022 |
Meadowvale Reserve Civil Works Construction Estimate | 2022 |
Boral Reynella Quarry Rehabilitation | 2022 |
Hawkesbury Landfill Rehabilitation | 2022 |
Princes Hwy intersections estimates | 2022 |
Ethelton station platform upgrade. | 2022 |
St Bernards Road / Moules Road / Arthur St Intersection, Right Turn Lanes | 2022 |
Kempe Road Sealing Project | 2022 |
Beach Road, near Valentine Street, Shared Path Refuge, Hackham West | 2022 |
Rehabilitation Toowoomba | 2022 |
Bridge Road / Research Road, Pooraka - Improving Heavy Vehicle Access | 2022 |