Adelaide Airport Terminal Expansion Project: Watpac
Adelaide Airport Terminal Expansion work will support forecast passenger growth to 2029 and include major expansion and refurbishment works of the existing terminal to provide a larger international departure area, more airport services and an enhanced layout.
CAPEX: AUD 165M | DATES: 2018 – 2020 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS was engaged by Watpac to provide cost estimation support to their estimating team, works included contract administration activities, tender packages reviews, and general cost estimation and advice.
VALUE ADDED
Capisce QS provided Watpac with a member of our team to provide on-site estimating assistance for the entire duration of the project. This fresh outlook on the project has highlighted risks and opportunities across many packages keeping our client informed ahead of critical time issues allowing strategic decision making to ensure success for the project.
The Salvation Army Australia - Unley and Mt Barker: TSA
Upgrade works to the existing Salvation Army Australia facilities located in Unley and Mount Barker. Works included refurbishment of existing properties including minor realignments and more extensive cosmetic repair works.
CAPEX: AUD 210K | DATES: 2019 | LOCATION: Unley & Mount Barker, SA
OUR INVOLVEMENT
Capisce QS was engaged by The Salvation Army to assess and provide monthly progress recommendation to contractor’s claims and variations.
VALUE ADDED
Capisce QS provided contract administration role for the Salvation Army. Capisce QS monitor monthly expenditure against budgeted categories, assess and report on how project costs are affected based on progress of work on site.
Middleback Arts Centre Whyalla: Grieve Gillett
Proposed refurbishment and extension of the Middleback Arts Centre in Whyalla including performing arts spaces, galleries and cinemas.
CAPEX: AUD 20M | DATES: 2018 – 2019 | LOCATION: Whyalla, SA
OUR INVOLVEMENT
Capisce QS provided master planning advice and concept estimating services on the total project cost of the construction of the Arts Centre. Construction methodology and procurement advice was also provided to the team in what promises to be an exciting new regional development.
VALUE ADDED
An understanding of the Whyalla area and an ability to provide sufficient detail in a limited time were key requirements of this project. Capisce QS provided a detailed estimate to the satisfaction of all stakeholders.
Keswick Barracks Base Wide Maintenance: WGA/Army Reserve & The Royal Australian Navy
Following consultation with the Army Reserve and the Royal Australian Navy and inspection of the buildings, WGA compiled a report setting out the scope of works of the maintenance/repair works at the Keswick Barracks.
CAPEX: Confidential | DATES: 2019 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS provided a 30% design estimate based on the scope of works provided by WGA.
VALUE ADDED
With Capisce QS’s industry experience and knowledge, informed and well-researched cost build-ups leading to a robust estimate with greater detail (serving to incorporate all assumptions), the Client is now well-placed and informed for budgetary and project execution purposes.
Reynella East College Redevelopment: DPTI
The key features of this redevelopment included construction of a new 4 no. court gymnasium building to basketball SA standards with change room and toilet amenities; 2 no. flexible classroom spaces; office space, staff amenities and storage areas; a kitchen / canteen; car parking spaces and landscaping.
CAPEX: AUD 13M | DATES: 2021 – 2022 | LOCATION: Reynella, SA
OUR INVOLVEMENT
Capisce QS was engaged to provide estimating & cost management services, from inception to completion.
VALUE ADDED
Capisce QS provided concept phase cost plans and developed detailed estimates to negotiate and verify Contractors Total Fixed Price (TFP), while providing support to project management throughout the pre-construction phases. During construction phase Capisce QS prepared progress claim assessments, assessment of variation claims, and monthly budget review to ensure budget and program were successfully maintained.
Country Health Sustainment: DPTI
The Country Health SA Local Health Network (CHSALHN) Asset Sustainment Program was announced by the Government in December 2017. The program of works is to be implemented to focus on the backlog of sustainment works associated with country hospitals and aged care facilities and to address high priority areas including asset sustainment, compliance and accreditation.
Urgent attention is required for electrical and fire services upgrades with 18 sites across Country Health SA Regions. Whilst all facilities satisfied construction best practice and legal requirements at the time of construction, compliance issues are now present with ageing equipment that country hospitals wish to address and rectify.
CAPEX: AUD 12M | DATES: 2019 | LOCATION: Various Regional Areas, SA
OUR INVOLVEMENT
Capisce QS were engaged by Department of Planning, Transport and Infrastructure (DPTI) on behalf of Country Health SA Local Hospital Network (CHSALHN) to report on the Financial Status of Electrical Services Upgrade works for various regional hospital sites.
VALUE ADDED
Capisce QS has provided DPTI with monthly progress and financial reports to illustrate the projects budget status, contingency commitment, expenditure status, project cash flow and report on general site progress, claims and issues.
Southern Parklands 22 Concept: Grieve Gillett
Construction of a new two storey hockey club building and a one storey netball club in the southern parklands of Adelaide CBD.
CAPEX: AUD 8M | DATES: 2018 – 2019 | LOCATION: Adelaide, SA
OUR INVOLVEMENT
Capisce QS provided estimating services on the concept of a new two storey hockey club and a one storey netball club in the southern parklands. Works included multiple options and value management studies to ensure best value for money outcomes were achieved.
VALUE ADDED
Capisce QS provided sufficient cost planning information to the client with minimal information to allow progressive decision making to take place and early stages in this this project.
Morphettville Apartments Lot 3: SA Housing
The Morphettville Urban Renewal Project involves the construction of a ground plus three-storey apartment building of 12 apartments and associated car parking, landscaping, and site improvements on a single land title site at Lot 3 Appleby Road, Morphettville, South Australia.
CAPEX: AUD 3.8M | DATES: 2019 | LOCATION: Morphettville, SA
OUR INVOLVEMENT
Capisce QS was engaged by South Australian Housing Trust to provide quantity surveying post contract consultancy services including the following listed works:
- Assessment of work in progress including preparation of interim payment assessments;
- Estimating, pricing, negotiation and finalization of variations;
- Monitoring and preparation of monthly progress reports on construction progress and financial position;
- Provide advice as required in protecting the interests of SA Housing.
VALUE ADDED
Capisce QS retains internal benchmark information that enables its construction cost managers to provide expert solutions to complex challenges. From the earliest stages of a project, its experts can assess if the project requirements can be achieved and, if needed, they can promptly deliver viable alternatives.
Give us a call to talk to our team to hear how we added value on all noted projects
Project Title | Date |
---|---|
Middleback Art Centre Whyalla | 2019 |
Lobethal Arts and Heritage Hub | 2019 |
Varcoe Foundry Artist Hub, Mt. Gambier | 2019 |
Lobethal Arts and Heritage Full Masterplan | 2020 |
Chaffey Theatre Masterplan | 2020 |
Varcoe Foundry Refurbishment | 2021 |
Masterplan for Northern Festival Centre and Sir Robert Helpman | 2021 |
Project Title | Date |
---|---|
August Tower Level 11, Estimate | 2018 |
Reinstatement Insurance Costs Estimates | 2018 |
Alexander Symonds Office Fitout | 2018 |
Temporary Fitout at 99 Frome Street | 2019 |
Level 3, 300 Pirie Street Fitout | 2019 |
New Porsche Centre - Feasibility Study | 2020 |
Feasibility Study of Refurbishment of DfE office space | 2021 |
DEWC Building | 2021 |
Buronga Landfill Expansion | 2021 |
Insurance Replacement 427 Port Road, Croydon | 2021 |
Rebel Ford Elizabeth Way, Elizabeth | 2021 |
Keolis Downer Adelaide Dry Creek Depot Modifications | 2021 |
81 Flinders St Levels 7, 8, 11 and 12 Refurbishment | 2021 |
Lot 1 Old Port Wakefield Road Virginia | 2021 |
Wakefield House Plant and Equipment Upgrade | 2022 |
Education Centre Bathroom and Foyer Upgrade | 2022 |
State Administration Centre Foyer, Lift and Bathroom Refurbishment | 2022 |
Wakefield House Refurbishment | 2022 |
Nurioopta Winery Insurance Valuation | 2022 |
Woolcock Group Building 3 Edward Park Fire Damage | 2022 |
Ambra Cellar Door Spritz & Gin Bar Function Area Upgrade | 2022 |
Brighton Dunes Seniors Residential Building - Roofing | 2022 |
Lenswood Cold Store | 2022 |
Project Title | Date |
---|---|
Airport Contract Administration works | 2021 |
Service Station & Truck Stop Mildura | 2018 |
The Salvation Army Australia - Mt Barker | 2019 |
Refurbishment of Linsell Lodge | 2020 |
Cirkidz Redevelopment | 2020 |
Bureau of Meteorology (BOM) Automatic Weather Station Rundle Island | 2020 |
Uniting SA Building Services Audit | 2020 |
SA Produce Market Fire Safety | 2020 |
Hindley Street Police Station | 2020 |
Elizabeth Magistrate Court Air Conditioning | 2021 |
Old Reynella Bus Interchange Amenity Upgrade | 2021 |
SAPN Substation Works – 622 South Road, Angle Park | 2021 |
SAPN Marleston North Depot Works | 2021 |
Civic Centre Lower Ground Floor HVAC Replacement | 2021 |
SAPN Angle Park Transmission Centre | 2021 |
Power Stations Generation Assets | 2021 |
Jane Eliza Development | 2021 |
Old Police Station / Courthouse Murray Bridge | 2021 |
National Wine Centre Electrical | 2021 |
Bureau of Meteorology Weather Watch Radar Serpentine WA | 2021 |
Perth Federal Courts Concept Estimates | 2021 |
Bureau of Meteorology S1 Dropper, Taroom | 2021 |
Bureau of Meteorology Broome Civils | 2021 |
Bureau of Meteorology - S Band Doppler radar, Karratha | 2021 |
Bureau of Meteorology - S Band Doppler radar, Greenvale, QLD - Assessment | 2021 |
Prospect Road Upper Floor Car Park | 2021 |
Broadview Community Hub | 2021 |
Bureau of Meteorology - S Band Doppler Radar, Richmond QLD | 2021 |
SACC Masterplan | 2021 |
The Hangar Coworking Space, Mylor | 2022 |
Bureau of Meteorology AMBLS Rockhampton | 2021 |
Bureau of Meteorology - S Band Doppler Radar, Marburg | 2022 |
Adelaide Youth Court | 2022 |
Jetty Road Glenelg Masterplan | 2022 |
Project Title | Date |
---|---|
Woomera Rocket Launchers JAXA & HRV | 2019 |
Advanced Ordnance Technology Woomera Site Works | 2019 |
Kapooka Range Referbishment Project | 2019 |
Phase 2B Maritime Patrol Aircraft RAAF Darwin | 2019 |
Keswick Barracks Base Wide Maintenance Works | 2020 |
RAFF Edinburgh Accommodation Works | 2019 |
CUF Wharf Pavement Settlement and remediation | 2020 |
DSTG EDN i0293 Refurbishment | 2020 |
Department of Defence - EIG | 2020 |
Fishermans Bend AOSC Works | 2020 |
Fishermans Bend Building 11 Works | 2021 |
Fishermans Bend Building 24 Works | 2020 |
ANI HQ Estimate Review | 2020 |
Aegis Transition Project | 2020 |
DST Room Accreditation | 2021 |
Defence Building 497 Fit Study | 2021 |
Defence - Building 733 South Fit Study | 2021 |
Defence - Building 733 North Fit Study | 2021 |
JDFPG Warehouse Air Conditioning Upgrade | 2021 |
Audio Security Works | 2021 |
EST06879 Remediation Project | 2021 |
NT Ranges Project - United States Force Posture Initiative | 2021 |
AMBLS Kalgoorlie | 2021 |
Transonic Security Upgrade | 2021 |
RAAF Edinburgh EO OLA Works | 2021 |
DSTO EWSD EOP Heavy Equipment Shed | 2021 |
Project Title | Date |
---|---|
Mount Barker High School Redevelopment | 2019 |
Mount Barker Primary School Redevelopment | 2019 |
Banksia Park International High School Redevelopment | 2019 |
Reynella East College Redevelopment | 2019 |
The Heights School Redevelopment | 2019 |
Golden Grove High School - ECI | 2020 |
Flinders Baudin Reseach Centre Kangaroo Island | 2020 |
Hans Heysen Decoupling Project - City West Campus | 2020 |
Vision for the North | 2020 |
DISP Accreditation Project, Building W, Mawson Lakes Campus | 2020 |
Fire Detection Replacement | 2020 |
IQRA College Sports Hall BGA Project | 2020 |
Academic Organisation Transformation Business Accommodation Fitout | 2020 |
Thebarton Senior College Outdoor Learning Centre | 2020 |
Birdwood High School - Building 4 Roof Replacement | 2020 |
Goolwa High School Redevelopment | 2020 |
Ingkarni Wardli Trigeneration Project | 2020 |
Mawson Lakes Culvert | 2020 |
Richmond Primary School Rooms 11 and 17 Refurbishment | 2021 |
Modular Schools | 2021 |
CWE DB AC/Ventilation Print Workshop Upgrade | 2021 |
Mitcham Girls High School Remediation | 2020 |
Greenwith PS Backbone Link Assessment | 2021 |
Aldinga Primary School Hydraulics Assessment | 2021 |
TAFE SA - Digital Efficiency Project | 2021 |
Elizabeth North Primary School Security Assessment | 2021 |
Black Forrest Primary School Redevelopment | 2021 |
Greenwith PS - Variation Review Fire Main Works | 2021 |
UniSA Mawson Lakes Building MM Timber Façade Rectification | 2021 |
Elizabeth North Primary School Pumping Station Assessment | 2021 |
Chiller Water Plant Replacement Hawke Building City West | 2021 |
Heathfield Primary School - Access ramps and civil work | 2021 |
Low Load Chiller Replacement Mawson Lakes | 2021 |
Nexus 10 Facility Building Services | 2021 |
Kingston Community School Hydraulics Assessment | 2021 |
Elizabeth North Primary School: Landscaping Assessment | 2021 |
Mannum Community College | 2021 |
Temple Christian College | 2021 |
Clare HS Bathroom | 2021 |
Coorara Primary School - Learning Area Renovation | 2021 |
UniSA Mass Notification System (MNS) - Fire Upgrade | 2021 |
Moonta Area School - Sewer to Street Mains Assessment | 2021 |
Ardtornish PS New Fire Mains Upgrade Work Assessment | 2021 |
Bachelor of IT Project Space | 2021 |
Engineering Final Year Project Space | 2021 |
Power Outlets Greenhouse EA and ED | 2021 |
Gas Line Decommissioning - UniSA | 2021 |
Modular Schools Construction Phase | 2022 |
Woodend Primary School - BD-1 | 2022 |
Loxton Lutheran School | 2022 |
Project Title | Date |
---|---|
ECH Financial Review | 2018 |
Country Health Sustainment | 2018 |
29-35 Raglan Avenue Edwardstown Medical Centre | 2019 |
Sensor and Trials Facility | 2020 |
AOT Clinical Health Science Accommodation Upgrade - UniSA City East Campus | 2020 |
UGS Labs Air Conditioning Upgrade | 2020 |
Regional ASP Electrical Infrastructure Upgrade - Eyre & Far North Hospitals | 2021 |
Regional ASP Electrical Infrastructure Upgrade - South East Hospitals | 2021 |
Wallaroo Hospital Physio Area Feasibility Study | 2021 |
FMC Renal Dialysis Fitout | 2021 |
Project Title | Date |
---|---|
Gilbert Street Accomodation | 2019 |
Penny Place 2 | 2018 |
Gilbert Street Project Management | 2019 |
Morphettville Lot 3 Apartments | 2019 |
100 Homes Economic Stimulus | 2019 |
Tika Tirka Insurance Replacement Cost | 2019 |
Mill Street Units Refurbishment | 2019 |
Seafield Tower | 2019 |
Kadina Investment Property Bank report | 2019 |
181 Waymouth Street Apartments | 2019 |
Stimulus 250 houses (QS Consultancy Services) | 2020 |
Playford Alive Display Village | 2020 |
Home Lottery Prize Valuation | 2021 |
South Australian Housing Association Code Book Review | 2021 |
The Royal Redevelopment | 2021 |
Project Title | Date |
---|---|
Southern Parklands Park 22 Concept | 2018 |
Adelaide Aquatic Centre Costing Analysis | 2019 |
Water Jump, Victoria Park | 2019 |
Puckapunyal Sporting Precinct | 2019 |
Kingston Park Kiosk | 2020 |
Grange SLSC Storage Facility | 2020 |
Aldinga Sports Park Soccer (Football) Building | 2021 |
The Hill & The Hub Recreation Centres HVAC Upgrade | 2021 |
Glenthorne National Park - Ityamaiitpinna Yarta | 2021 |
Community Building Design for Park 21W | 2021 |
Replacement of Evaporative A/C System to Turramurra Recreation Centre | 2021 |
Granite Island Recreation Park Visitor Experience Master Plan | 2021 |
Gepps Cross Reserve | 2021 |
Kingston Park Kiosk | 2021 |
ORSR Netball SA Stadium ACP Cladding | 2022 |
Buffalo Site - Wigley Reserve | 2022 |
Jetty Road to Broadway Beach Access Point | 2022 |
Brighton Beachfront Holiday Park - Old Caretakers Cottage Site | 2022 |